Independent and free. No login, no email required. How we make money
FieldPricing

Data checked · source: US Bureau of Labor Statistics

How much does it cost to replace a water heater?

A 40-50 gallon tank swap, priced from the actual equipment price, the actual parts list, and the government wage data for the plumber doing the work.

Expect roughly $653 to $3,359 to replace a 40-50 gallon tank water heater in the United States in 2026. The labour half of that is 2–5 hours at a billed rate of about $68–$98 an hour, which is what the US median plumber wage of $30.67 works out to once a shop covers burden, overhead and profit.

Where the money actually goes

This is the same quote, taken apart. Every line is a real price from a real listing or a published fee schedule, not a number we made up.

LineLowHighWhat decides it
Equipment$439$1,889 Which unit you pick. The table below lists them.
Parts and fittings$58$191 Most jobs need some of the parts list, not all of it.
Labour (2–5 hr)$136$489 Hours × billed rate. Varies by metro — see below.
Permit$21$290 Set by your city. Median $75.
Disposal$0$500 Usually bundled into a contractor replacement.
Total$653 $3,359

The low column assumes a straightforward job with the cheapest listed equipment; the high column assumes the full parts list, the top of the labour range and the most expensive permit jurisdiction we measured. Most real quotes land in the middle.

What the equipment costs

OptionUnit price
40 gal electric (standard)$439–$699
50 gal electric (standard)$509–$699
40 gal gas (atmospheric)$629–$899
50 gal gas (atmospheric)$699–$899
40-50 gal heat pump / hybrid electric$1,189–$1,889

Source: Home Depot tank water heater category pages, checked August 6, 2026.

Specific products, with the price we saw

Not a recommendation and not an affiliate link. These are the listings we checked on August 6, 2026, so you can see whether the equipment line on your quote is close to retail.

Retail prices move. If one of these is wrong now, tell us and we will fix it with the date.

Parts list

What this job costs in 49 US metro areas

Materials cost roughly the same everywhere. Labour does not. The wage column is US government data; the labour column is that wage run through our published multiplier; the total applies it to the job above. San Jose-Sunnyvale-Santa Clara comes out 13% higher than Tampa-St. Petersburg-Clearwater on the same work.

Metro areaPlumber wage Labour on this jobEstimated total
San Jose-Sunnyvale-Santa Clara, CA$51.71$483$746–$3,695
Chicago-Naperville-Elgin, IL-IN$49.70$464$737–$3,663
Minneapolis-St. Paul-Bloomington, MN-WI$48.86$457$734–$3,649
Portland-Vancouver-Hillsboro, OR-WA$48.56$454$732–$3,645
Boston-Cambridge-Newton, MA-NH$46.52$435$723–$3,612
Seattle-Tacoma-Bellevue, WA$45.78$428$720–$3,600
Detroit-Warren-Dearborn, MI$41.53$388$701–$3,532
Milwaukee-Waukesha, WI$40.72$381$698–$3,519
Providence-Warwick, RI-MA$38.37$359$687–$3,482
New York-Newark-Jersey City, NY-NJ$37.79$353$685–$3,473
San Francisco-Oakland-Fremont, CA$37.44$350$683–$3,467
Hartford-West Hartford-East Hartford, CT$37.11$347$682–$3,462
St. Louis, MO-IL$37.02$346$681–$3,460
Indianapolis-Carmel-Greenwood, IN$37.01$346$681–$3,460
Kansas City, MO-KS$36.61$342$679–$3,454
Philadelphia-Camden-Wilmington, PA-NJ-DE-MD$35.99$336$677–$3,444
Louisville/Jefferson County, KY-IN$35.91$336$676–$3,443
San Diego-Chula Vista-Carlsbad, CA$34.86$326$672–$3,426
Washington-Arlington-Alexandria, DC-VA-MD-WV$34.55$323$670–$3,421
Los Angeles-Long Beach-Anaheim, CA$34.19$320$669–$3,415
Pittsburgh, PA$33.70$315$667–$3,407
Sacramento-Roseville-Folsom, CA$31.35$293$656–$3,370
Cincinnati, OH-KY-IN$31.33$293$656–$3,370
Salt Lake City-Murray, UT$31.15$291$655–$3,367
Riverside-San Bernardino-Ontario, CA$30.73$287$653–$3,360
Denver-Aurora-Centennial, CO$30.72$287$653–$3,360
Albuquerque, NM$30.72$287$653–$3,360
Phoenix-Mesa-Chandler, AZ$30.65$286$653–$3,359
Columbus, OH$30.41$284$652–$3,355
Baltimore-Columbia-Towson, MD$30.38$284$652–$3,355
Austin-Round Rock-San Marcos, TX$30.20$282$651–$3,352
New Orleans-Metairie, LA$30.03$281$650–$3,349
Virginia Beach-Chesapeake-Norfolk, VA-NC$29.75$278$649–$3,344
Richmond, VA$29.56$276$648–$3,341
Houston-Pasadena-The Woodlands, TX$29.47$275$648–$3,340
Dallas-Fort Worth-Arlington, TX$29.45$275$648–$3,340
Raleigh-Cary, NC$29.10$272$646–$3,334
Nashville-Davidson-Murfreesboro-Franklin, TN$28.90$270$645–$3,331
Las Vegas-Henderson-North Las Vegas, NV$28.70$268$645–$3,328
Oklahoma City, OK$28.44$266$643–$3,324
Jacksonville, FL$28.33$265$643–$3,322
Charlotte-Concord-Gastonia, NC-SC$28.22$264$642–$3,320
Memphis, TN-MS-AR$28.22$264$642–$3,320
Atlanta-Sandy Springs-Roswell, GA$28.07$262$642–$3,318
San Antonio-New Braunfels, TX$27.97$261$641–$3,316
Miami-Fort Lauderdale-West Palm Beach, FL$27.77$260$640–$3,313
Charleston-North Charleston, SC$27.58$258$640–$3,310
Orlando-Kissimmee-Sanford, FL$26.62$249$635–$3,295
Tampa-St. Petersburg-Clearwater, FL$25.00$234$628–$3,269

Wages: BLS OEWS May 2025, SOC 47-2152 — public domain. Metros where BLS suppressed the figure are left out rather than estimated. Totals are FieldPricing calculations from the parts and hours on this page — they are not quotes and no contractor has agreed to them.

What did you actually pay?

Everything above this line is arithmetic on public data. It is honest, and it is not the same thing as a real invoice. If you have had this work done, the number on your invoice is worth more to the next reader than anything we can calculate.

No reports on this job yet. This site went up in August 2026 and nobody has sent one in. We would rather show you an empty table than invent entries to look established.

When reports come in, they get published here with the amount, the city and the month — never a name, never an email.

No account, no login, no newsletter. A person reads every submission before it appears, so it will not show up instantly. If we cannot make sense of one, we leave it out rather than guess — and if you would rather just email it, that works too.

What actually moves the price

Gas vs electric

Gas adds roughly an hour of labour for venting and the gas connection, and the unit itself costs more. Electric is the cheaper install.

Switching fuel or size

Going from electric to gas, or 40 to 75 gallon, means new venting, new gas line or a new circuit. That is a different job, not a swap.

Access

A tank in a finished basement with a straight path out is a swap. A tank in an attic, a crawlspace, or up a flight of stairs adds hours and sometimes a second person.

Code catch-up

An old install that predates current code often needs an expansion tank, a proper T&P discharge line, a sediment trap or a drain pan added. Each is cheap in parts and real in labour.

Code requirements that cost money

These are the things an inspector will look for, and each one is a line on the invoice that a homeowner often reads as padding. Mostly it is not.

Code citations are to the California Plumbing and Mechanical Codes unless noted, because California publishes its handouts openly. Your jurisdiction adopts its own version of the model code — check locally before relying on any of this.

What we could not verify

We publish this list because a cost page that never admits a gap is not telling you the truth.

How we got these numbers

We do not use RSMeans or Craftsman cost data. Their licences forbid building a database from them, so every number here traces to a public source or a public listing you can open yourself.

This page is not a quote. It is arithmetic on public data. Get it in writing from a licensed contractor before you spend anything. If a number here is wrong, tell us — we log every correction with the date.

Related